SUBSECRETARIA DE INFRAESTRUCTURA |
DIRECCION GENERAL DE CONSERVACION DE CARRETERAS |
Programa Nacional de Conservación de Carreteras |
Avance Fìsico - Financiero |
|
|
|
|
|
|
DICIEMBRE 2019 |
NOMBRE DE LA OBRA |
UBICACIÓN |
META |
ASIGNACION |
AVANCE FISICO |
AVANCE FINANCIERO |
Km Inicial |
Km Final |
UNIDAD |
% |
COAHUILA |
|
|
|
432,905,984.00 |
|
99.04 |
95.78 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PSV Morelos (Monclova - Piedra Negras) |
191+200 |
1.00 |
4,000,000.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recuperación de 10.0 cm y Carpeta de 5.0 cm |
|
|
46.21 |
140,170,251.00 |
46.21 |
100.00 |
95.54 |
Saltillo - Torreón (Cpo. B) mezcla de alto desempeño |
130.00 |
152.00 |
22.00 |
60,921,180.00 |
22.00 |
100.00 |
96.28 |
Torreón - San Pedro de las Colonias (Cpo. A) |
34.00 |
53.21 |
19.21 |
58,274,949.00 |
19.21 |
100.00 |
95.85 |
Monclova - Piedras Negras (2 Cpos.) mezcla de alto desempeño |
240.00 |
242.90 |
5.00 |
20,974,122.00 |
5.00 |
100.00 |
92.58 |
|
|
|
|
|
|
|
|
Riego de Sello |
|
|
189.40 |
78,179,757.00 |
189.40 |
100.00 |
95.14 |
T. La Esperanza - La Cuchilla (Cpo. A) |
160.00 |
185.00 |
25.00 |
8,488,156.00 |
25.00 |
100.00 |
100.00 |
Saltillo - Entro. Puebla (Cpo. B) |
8.00 |
19.20 |
11.20 |
3,779,023.00 |
11.20 |
100.00 |
100.00 |
Ojo Caliente - Santa Cruz (contrato no. 068) |
1.00 |
34.00 |
32.90 |
16,700,000.00 |
32.90 |
100.00 |
92.77 |
Nuevo Laredo - Pidras Negras (contrato no. 071) |
44.40 |
65.00 |
20.60 |
6,900,000.00 |
20.60 |
100.00 |
99.50 |
Lim de Edos. Zac/Coah.-Saltillo (contrato no.069) |
287.00 |
321.00 |
34.00 |
17,300,000.00 |
34.00 |
100.00 |
95.05 |
Lim de Edos. N.L./Coah.-Saltillo (contrato no.072) |
202.00 |
212.50 |
10.50 |
5,400,000.00 |
10.50 |
100.00 |
87.82 |
Saltillo - Torreón Cpo A. (contrato no.072) |
33.50 |
65.50 |
32.00 |
9,912,578.00 |
32.00 |
100.00 |
95.20 |
Saltillo - Torreón Cpo B. (contrato no.072) |
152.00 |
166.00 |
14.00 |
5,500,000.00 |
14.00 |
100.00 |
98.78 |
Saltillo - Monterrey Cpos. A y B (contrato no. 072) |
15.30 |
19.90 |
9.20 |
4,200,000.00 |
9.20 |
100.00 |
88.08 |
|
|
|
|
|
|
|
|
Conservación Rutinaria de Tramos (Lineal del Estado) |
|
|
1,483.67 |
104,346,966.00 |
1,483.66 |
100.00 |
99.09 |
Gastos de Operación |
|
|
|
7,690,515.00 |
|
|
78.44 |
|
|
|
|
|
|
|
|
Señalamiento Horizontal (Lineal del Estado) |
|
|
1,483.67 |
43,112,726.00 |
1,483.67 |
100.00 |
97.42 |
|
|
|
|
|
|
|
|
Barrera de Protección(contrato no. 033) |
|
|
13,869.00 |
10,998,931.00 |
13,869.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Señalamiento Vertical (contrato no. 031) |
|
|
5,813.00 |
14,544,704.00 |
5,813.00 |
100.00 |
100.00 |
Señalamiento Vertical (contrato no. 032) |
|
|
5,475.00 |
15,124,943.00 |
5,475.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Conservación Rutinaria de Puentes (contrato no. 013) |
|
|
171.00 |
4,024,336.00 |
171.00 |
100.00 |
99.88 |
Conservación Rutinaria de Puentes (contrato no. 014) |
|
|
166.00 |
4,128,478.00 |
166.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Estudios y/o Proyectos |
|
|
|
1,000,000.00 |
|
|
50.92 |
Seguimiento |
|
|
|
3,002,172.00 |
|
|
100.00 |
Seguimiento |
|
|
|
2,582,205.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|