SUBSECRETARIA DE INFRAESTRUCTURA |
DIRECCION GENERAL DE CONSERVACION DE CARRETERAS |
Programa Nacional de Conservación de Carreteras |
Avance Fìsico - Financiero |
|
|
|
|
|
|
DICIEMBRE 2019 |
NOMBRE DE LA OBRA |
UBICACIÓN |
META |
ASIGNACION |
AVANCE FISICO |
AVANCE FINANCIERO |
Km Inicial |
Km Final |
UNIDAD |
% |
DURANGO |
|
|
|
507,468,335.00 |
|
100.00 |
95.27 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mapimi (Bermejillo - Palmito) |
24+500 |
1.00 |
1,633,607.05 |
1.00 |
100.00 |
96.54 |
Río Florido (La Zarca - Lím. de Edos. Dgo./Chih.) |
330+000 |
1.00 |
8,230,840.48 |
1.00 |
100.00 |
99.97 |
Puente Santa Rosa II )(contrato no. 611) |
270+500 |
1.00 |
7,656,192.88 |
1.00 |
100.00 |
98.72 |
Ricon del Conde (J.Gpe. Aguilera - Guanacevi) |
207+000 |
finiquito |
108,100.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fresado de 3.0 cm y Carpeta de 5.0 cm |
|
|
11.00 |
23,884,641.45 |
11.00 |
100.00 |
98.17 |
Lím. de Edos. Zac./Dgo. - Durango (Cpo. B) |
268.00 |
279.00 |
11.00 |
23,036,448.16 |
11.00 |
100.00 |
98.11 |
Lím. de Edos. Zac./Dgo. - Durango (Cpo. B) |
268.00 |
279.00 |
finiquito |
848,193.29 |
|
|
100.00 |
|
|
|
|
|
|
|
|
Bacheo y Carpeta |
|
|
|
6,185,745.00 |
|
|
100.00 |
J. Guadalupe Aguilera - Guanacevi (contrato no.201810CBA618W002018) |
91.00 |
97.00 |
finiquito |
6,185,745.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|
Recuperación de 20.0 cm y Carpeta de 5.0 cm |
|
|
21.00 |
134,724,803.08 |
21.00 |
100.00 |
97.95 |
Cuencamé - Gómez Palacio mezcla de alto desempeño |
148.00 |
159.00 |
11.00 |
73,154,159.46 |
11.00 |
100.00 |
97.25 |
Lím. de Edos. Zac./Dgo. - Cuencamé mezcla de alto desempeño |
157.00 |
167.00 |
10.00 |
60,653,356.62 |
100.00 |
100.00 |
98.77 |
Libramiento Periferico Cuencamé |
5.70 |
8.60 |
finiquito |
917,287.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|
Renivelación y Riego de Sello |
|
|
82.30 |
103,571,893.46 |
82.30 |
100.00 |
95.32 |
Durango - Mezquital |
54.30 |
66.30 |
12.00 |
11,733,643.08 |
12.00 |
100.00 |
97.60 |
Gómez Palacio - Tlahualilo |
50.00 |
72.00 |
22.00 |
23,854,116.62 |
22.00 |
100.00 |
94.54 |
Durango - Cuencamé |
10.50 |
25.00 |
14.50 |
13,058,489.68 |
14.50 |
100.00 |
93.87 |
Durango - Cuencamé |
91.00 |
100.00 |
9.00 |
8,858,417.13 |
9.00 |
100.00 |
96.81 |
Libramiento Nombre de Dios |
233.00 |
238.00 |
5.00 |
8,400,160.58 |
5.00 |
100.00 |
96.92 |
Lím. Edos. Zac./Dgo.-Durango(contrato no.201910CBA618W002019) |
252.40 |
260.00 |
7.60 |
13,200,000.00 |
7.60 |
100.00 |
94.45 |
Durango - Mezquital(contrato no.201910CBA619W002019) |
66.30 |
78.50 |
12.20 |
15,000,000.00 |
12.20 |
100.00 |
92.05 |
Durango - Cuencamé (contrato no.201810CBA552W002018) |
61.00 |
75.00 |
finiquito |
1,290,993.12 |
|
|
100.00 |
Gómez Palacio - La Union (contrato no.201810CBA553W002018) |
7.00 |
15.00 |
finiquito |
620,577.25 |
|
|
100.00 |
Durango - Cuencamé (contrato no.201810CBA617W002018) |
127.00 |
143.80 |
finiquito |
7,555,496.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|
Bacheo y Riego de Sello |
|
|
25.00 |
10,436,304.39 |
25.00 |
100.00 |
98.66 |
Durango - Lím. de Edos. Dgo./Sin. |
108.00 |
118.00 |
10.00 |
4,115,262.29 |
10.00 |
100.00 |
97.09 |
Durango - Lím. de Edos. Dgo./Sin. |
130.00 |
145.00 |
15.00 |
5,048,283.30 |
15.00 |
100.00 |
99.60 |
Libramiento Sur de Durango (contrato no.201810CBA554W002018) |
0.00 |
27.70 |
finiquito |
1,272,758.80 |
|
|
100.00 |
|
|
|
|
|
|
|
|
Riego de Sello |
|
|
11.92 |
5,767,669.95 |
11.92 |
100.00 |
97.12 |
Lím. de Edos. Zac./Dgo. - Durango (Cpo. A) |
260.00 |
267.00 |
7.00 |
2,994,080.33 |
7.00 |
100.00 |
98.29 |
Lím. de Edos. Zac./Dgo. - Durango |
190.08 |
195.00 |
4.92 |
2,230,751.83 |
4.92 |
100.00 |
96.97 |
Lim. Edos Zac./Dgo. - Cuencamé (contrato no.201810CBA555W002018) |
117.00 |
197.00 |
finiquito |
355,229.35 |
|
|
100.00 |
Libramiento Periferico Cuencamé (contrato no.201810CBA556W002018) |
0.00 |
5.70 |
finiquito |
187,608.44 |
|
|
74.71 |
|
|
|
|
|
|
|
|
Riego de Protección |
|
|
14.00 |
2,510,876.98 |
14.00 |
100.00 |
97.09 |
Lím. de Edos. Zac./Dgo. - Durango (Cpo. A) |
267.00 |
273.00 |
6.00 |
1,221,573.06 |
6.00 |
100.00 |
94.52 |
Lím. de Edos. Zac./Dgo. - Durango |
236.00 |
238.00 |
8.00 |
1,289,303.92 |
8.00 |
100.00 |
99.52 |
|
|
|
|
|
|
|
|
Durango - Lim. de Edos Dgo/Sin |
99.30 |
100.00 |
1.40 |
2,133,383.41 |
1.40 |
100.00 |
97.09 |
Durango - Lim. de Edos Dgo/Sin |
101.00 |
101.20 |
0.40 |
609,538.12 |
0.40 |
100.00 |
97.09 |
Durango - Lim. de Edos Dgo/Sin |
54.80 |
55.00 |
0.20 |
304,769.06 |
0.20 |
100.00 |
97.09 |
|
|
|
|
|
|
|
|
Conservación Periódica de Puentes |
|
|
4.00 |
5,000,000.00 |
4.00 |
100.00 |
87.34 |
|
|
|
|
|
|
|
|
Conservación Rutinaria de Tramos (Lineal del Estado) |
|
|
1,968.23 |
121,662,657.05 |
1,968.23 |
100.00 |
91.11 |
Conservación Rutinaria de Tramos(contrato no.201810CBA512W002018) |
|
|
finiquito |
158,083.83 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA513W002018) |
|
|
finiquito |
347,787.64 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA514W002018) |
|
|
finiquito |
187,030.28 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA515W002018) |
|
|
finiquito |
122,899.28 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA516W002018) |
|
|
finiquito |
88,984.82 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA517W002018) |
|
|
finiquito |
102,578.35 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA518W002018) |
|
|
finiquito |
408,025.01 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA519W002018) |
|
|
finiquito |
125,594.36 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA520W002018) |
|
|
finiquito |
199,999.99 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA521W002018) |
|
|
finiquito |
92,540.56 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA522W002018) |
|
|
finiquito |
97,457.48 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA523W002018) |
|
|
finiquito |
98,279.17 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA524W002018) |
|
|
finiquito |
66,434.66 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA525W002018) |
|
|
finiquito |
213,924.09 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA526W002018) |
|
|
finiquito |
178,046.28 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA527W002018) |
|
|
finiquito |
199,999.22 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA528W002018) |
|
|
finiquito |
157,379.97 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA529W002018) |
|
|
finiquito |
93,610.26 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA530W002018) |
|
|
finiquito |
180,789.33 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA531W002018) |
|
|
finiquito |
159,669.22 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA532W002018) |
|
|
finiquito |
59,437.72 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA534W002018) |
|
|
finiquito |
40,893.04 |
|
|
0.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA535W002018) |
|
|
finiquito |
173,728.94 |
|
|
100.00 |
Conservación Rutinaria de Tramos(contrato no.201810CBA536W002018) |
|
|
finiquito |
199,533.28 |
|
|
100.00 |
Gastos de Operación |
|
|
|
8,782,509.00 |
|
|
93.68 |
|
|
|
|
|
|
|
|
Señalamiento Horizontal (Lineal del Estado) |
|
|
1,968.23 |
21,080,994.17 |
1,968.23 |
100.00 |
90.64 |
|
|
|
|
|
|
|
|
Barrera de Protección (contrato no.555) |
|
|
8,620.00 |
5,898,439.29 |
8,620.00 |
100.00 |
97.07 |
|
|
|
|
|
|
|
|
Señalamiento Vertical (contrato no.553) |
|
|
3,996.00 |
6,533,211.25 |
3,996.00 |
100.00 |
94.35 |
Señalamiento Vertical (contrato no.554) |
|
|
3,996.00 |
6,139,648.81 |
3,996.00 |
100.00 |
100.00 |
Señalamiento Vertical, (contrato no.201810CBA561W002019) |
|
|
finiquito |
2,763,596.01 |
|
|
97.52 |
|
|
|
|
|
|
|
|
Conservación Rutinaria de Puentes (contrato no.509) |
|
|
206.00 |
5,744,213.81 |
206.00 |
100.00 |
100.00 |
Conservación Rutinaria de Puentes (contrato no.510) |
|
|
127.00 |
3,730,001.52 |
127.00 |
100.00 |
99.40 |
|
|
|
|
|
|
|
|
Estudios y/o Proyectos |
|
|
|
2,750,000.00 |
|
|
74.70 |
Seguimiento |
|
|
|
2,938,912.00 |
|
|
100.00 |
Seguimiento |
|
|
|
2,933,080.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|