SUBSECRETARIA DE INFRAESTRUCTURA |
DIRECCION GENERAL DE CONSERVACION DE CARRETERAS |
Programa Nacional de Conservación de Carreteras |
Avance Fìsico - Financiero |
|
|
|
|
|
|
DICIEMBRE 2019 |
NOMBRE DE LA OBRA |
UBICACIÓN |
META |
ASIGNACION |
AVANCE FISICO |
AVANCE FINANCIERO |
Km Inicial |
Km Final |
UNIDAD |
% |
OAXACA |
|
|
|
889,622,550.00 |
|
98.49 |
94.36 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
El Salado (Lím de Edos. Pue./Oax. - Huajuapan de León) |
218+710 |
1.00 |
3,515,091.47 |
0.38 |
38.34 |
100.00 |
Lázaro Cárdenas (Lím de Edos. Ver./Oax. - Palomares) |
102+500 |
1.00 |
8,733,695.74 |
1.00 |
100.00 |
100.00 |
Felipe Ángeles (Lím de Edos. Ver./Oax. - Palomares) |
129+215 |
1.00 |
5,290,998.45 |
1.00 |
100.00 |
100.00 |
Guelatao II (Cerro Pelón - Oaxaca) |
161+000 |
1.00 |
19,401,256.46 |
1.00 |
100.00 |
100.00 |
Los Arcos (Miahuatlán - Pochutla) |
99+688 |
1.00 |
8,162,288.10 |
1.00 |
100.00 |
98.46 |
Sinaxtla (Yucudaa - Nochixtlán) |
86+100 |
1.00 |
12,937,756.50 |
1.00 |
100.00 |
100.00 |
Yutaquite (Lím de Edos. Gro./Oax. - Pinotepa Nacional) |
246+815 |
1.00 |
8,163,017.76 |
1.00 |
100.00 |
100.00 |
Rio Seco (Pochutla - Huamelula) |
305+714 |
1.00 |
3,795,895.52 |
1.00 |
100.00 |
100.00 |
Turupaches (Tapanatepec - Lim. Edos. Oax./Chis.) (nueva) |
16+820 |
1.00 |
4,841,133.08 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fresado de 5.0 cm y Carpeta de 5.0 cm |
|
|
37.50 |
110,579,483.72 |
37.50 |
100.00 |
99.48 |
Libramiento el Tule |
0.00 |
7.00 |
7.00 |
19,305,649.04 |
7.00 |
100.00 |
97.00 |
Oaxaca - Mitla mezcla de alto desempeño |
30.00 |
43.00 |
13.00 |
66,304,554.68 |
13.00 |
100.00 |
100.00 |
Mitla - Totolapan mezcla de alto desempeño |
43.00 |
47.50 |
4.50 |
9,933,389.02 |
4.50 |
100.00 |
100.00 |
Yucudaa - Tlaxiaco |
15.00 |
28.00 |
13.00 |
15,035,890.98 |
13.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Recuperacion Pavimento y Carpeta |
|
|
6.00 |
18,000,631.13 |
6.00 |
100.00 |
100.00 |
T. la Y - Sola de vega |
4.00 |
10.00 |
6.00 |
18,000,631.13 |
6.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Riego de Sello |
|
|
132.00 |
142,221,063.71 |
132.00 |
100.00 |
100.00 |
Totolapan - La Reforma |
100.00 |
118.00 |
18.00 |
19,899,049.84 |
8.00 |
100.00 |
100.00 |
Oaxaca - Mitla |
15.00 |
30.00 |
15.00 |
29,352,609.39 |
15.00 |
100.00 |
100.00 |
Tejupan - Nochixtlan |
50.00 |
71.00 |
21.00 |
18,538,553.00 |
21.00 |
100.00 |
100.00 |
Teotitlan - Huautla |
55.00 |
71.00 |
16.00 |
27,429,986.95 |
16.00 |
100.00 |
100.00 |
T. la Y - Sola de vega |
16.00 |
20.00 |
4.00 |
4,382,934.35 |
4.00 |
100.00 |
100.00 |
T. la Y - Sola de vega |
25.00 |
37.00 |
12.00 |
10,940,923.03 |
12.00 |
100.00 |
100.00 |
T. la Y - Sola de vega |
37.00 |
48.00 |
11.00 |
10,726,286.54 |
11.00 |
100.00 |
100.00 |
T. la Y - Sola de vega |
48.00 |
60.00 |
12.00 |
9,083,843.59 |
12.00 |
100.00 |
100.00 |
Putla - Pinotepa Nacional |
197.00 |
220.00 |
23.00 |
11,866,877.02 |
23.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Atención a Fallas Geológicas |
|
|
2.00 |
19,554,492.66 |
2.00 |
100.00 |
100.00 |
Huautla - Tuxtepec |
61+900 |
1.00 |
5,921,181.43 |
1.00 |
100.00 |
100.00 |
Huautla - Tuxtepec |
67+400 |
1.00 |
13,633,311.23 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Obra de Drenaje |
|
|
1.00 |
2,111,855.45 |
1.00 |
100.00 |
100.00 |
Putla - Pinotepa Nacional |
217+850 |
1.00 |
2,111,855.45 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Conservación Periódica de Puentes |
|
|
2.00 |
2,500,000.00 |
2.00 |
100.00 |
99.84 |
Conservación Periódica de Puentes |
|
|
4.00 |
2,500,000.00 |
4.00 |
100.00 |
91.87 |
|
|
|
|
|
|
|
|
Oaxaca - Tehuantepec |
232+500 |
1.00 |
9,464,481.95 |
1.00 |
100.00 |
100.00 |
La Ventosa - Tapanatepec |
20+000 |
1.00 |
10,087,076.73 |
1.00 |
0.00 |
100.00 |
Lím. de Edos. Ver./Oax - Salina Cruz. |
167+800 |
170+150 |
1.00 |
1,005,048.33 |
1.00 |
100.00 |
78.34 |
Lím. de Edos. Pue./Oax. - E.C. Huajuapan de León |
208+000 |
1.00 |
1,994,951.67 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Conservación Rutinaria de Tramos (Lineal del Estado) |
|
|
2,844.75 |
224,664,429.54 |
2,844.75 |
100.00 |
91.50 |
Finiquitos 2018 |
|
|
finiquito |
6,560,327.99 |
|
|
93.68 |
Gastos de Operación |
|
|
|
7,758,519.00 |
|
|
0.00 |
|
|
|
|
|
|
|
|
Señalamiento Horizontal (Lineal del Estado) |
|
|
2,844.75 |
41,291,624.34 |
2,844.75 |
100.00 |
98.14 |
|
|
|
|
|
|
|
|
Barrera de Protección (contrato no. 066) |
|
|
14,910.00 |
12,532,784.44 |
14,910.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Señalamiento Vertical (contrato no. 063) |
|
|
3,698.00 |
12,295,233.85 |
3,698.00 |
100.00 |
100.00 |
Señalamiento Vertical (contrato no. 064) |
|
|
5,381.00 |
11,191,885.73 |
1,100.00 |
20.44 |
30.00 |
Señalamiento Vertical (contrato no. 065) |
|
|
7,561.00 |
16,891,422.04 |
7,561.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Conservación Rutinaria de Puentes (contrato no. 021) |
|
|
82.00 |
2,799,889.19 |
82.00 |
100.00 |
100.00 |
Conservación Rutinaria de Puentes (contrato no. 014) |
|
|
86.00 |
2,962,785.93 |
86.00 |
100.00 |
100.00 |
Conservación Rutinaria de Puentes (contrato no. 015) |
|
|
70.00 |
2,952,357.53 |
70.00 |
100.00 |
100.00 |
Conservación Rutinaria de Puentes (contrato no. 009) |
|
|
71.00 |
2,892,215.50 |
71.00 |
100.00 |
100.00 |
Conservación Rutinaria de Puentes (contrato no. 018) |
|
|
64.00 |
2,855,159.12 |
64.00 |
100.00 |
100.00 |
Conservación Rutinaria de Puentes (contrato no. 016) |
|
|
106.00 |
2,909,132.17 |
106.00 |
100.00 |
100.00 |
Finiquitos 2018 |
|
|
finiquito |
32,380.23 |
|
|
100.00 |
Finiquitos 2018 |
|
|
finiquito |
57,619.48 |
|
|
100.00 |
|
|
|
|
|
|
|
|
Estudios y/o Proyectos |
|
|
|
24,250,000.00 |
|
|
76.00 |
Seguimiento (contrato no. 030-Y) |
|
|
|
3,054,924.00 |
|
|
100.00 |
Seguimiento (contrato no. 031-Y) |
|
|
|
3,275,761.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|
Coparticipación FONDEN (del 19 al 21 de octubre de 2018) |
|
|
|
92,108,759.13 |
|
|
100.00 |
Coparticipación FONDEN (del 17 al 18 de octubre de 2018) |
|
|
|
19,868,000.00 |
|
|
63.18 |
|
|
|
|
|
|
|
|