SUBSECRETARIA DE INFRAESTRUCTURA |
DIRECCION GENERAL DE CONSERVACION DE CARRETERAS |
Programa Nacional de Conservación de Carreteras |
Avance Fìsico - Financiero |
|
|
|
|
|
|
DICIEMBRE 2019 |
NOMBRE DE LA OBRA |
UBICACIÓN |
META |
ASIGNACION |
AVANCE FISICO |
AVANCE FINANCIERO |
Km Inicial |
Km Final |
UNIDAD |
% |
SAN LUIS POTOSI |
|
|
|
706,178,774.22 |
|
100.00 |
95.30 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Paso Ferrocarril (Lím. de Edos. Gto./S.L.P. - Ent. Cerro Gordo) |
142+800 |
1.00 |
7,384,163.10 |
1.00 |
100.00 |
99.98 |
Del Diablo (Cd.Valles - Lím. de Edos. S.L.P./Tamps.) |
38+740 |
1.00 |
7,253,716.58 |
1.00 |
100.00 |
99.74 |
PSV Colorines (Queretaro - S.L.P.) |
201+760 |
1.00 |
25,811,003.08 |
1.00 |
100.00 |
99.22 |
Lím. de Edos. Gto./S.L.P. – San Luis Potosí |
156+000 |
1.00 |
5,570,655.73 |
1.00 |
100.00 |
98.57 |
San Luis Potosí - Lím. de Edos. S.L.P./Zac. |
16+150 |
1.00 |
5,097,917.30 |
1.00 |
100.00 |
98.53 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bacheo y Carpeta de 5.0 cm |
|
|
6.00 |
12,299,508.41 |
6.00 |
100.00 |
99.99 |
San Luis Potosí - Lim. Edos. SLP/Zac (Ojuelos) |
64.00 |
70.00 |
6.00 |
12,299,508.41 |
6.00 |
100.00 |
99.99 |
|
|
|
|
|
|
|
|
Bacheo y Riego de Sello |
|
|
55.36 |
57,600,232.04 |
55.36 |
100.00 |
99.84 |
Querétaro - San Luis Potosí Cuerpo B |
185.00 |
191.80 |
6.80 |
9,333,224.97 |
6.80 |
100.00 |
100.00 |
San Luis Potosí - Lim. Edos. SLP/Zac (Ojuelos) |
10.70 |
30.00 |
19.30 |
16,787,084.11 |
19.30 |
100.00 |
99.98 |
San Luis Potosí - Lim. Edos. SLP/Zac (Ojuelos) |
41.00 |
46.00 |
5.00 |
4,280,802.69 |
5.00 |
100.00 |
99.99 |
San Luis Potosí - Matehuala |
0.49 |
16.75 |
16.26 |
21,761,535.21 |
16.26 |
100.00 |
100.00 |
San Luis Potosí – Matehuala, (Cuerpos A y B) T.A. |
0.49 |
16.75 |
8.00 |
5,437,585.06 |
8.00 |
100.00 |
98.40 |
|
|
|
|
|
|
|
|
Renivelación y Riego de Sello |
|
|
202.74 |
162,795,628.85 |
202.74 |
100.00 |
99.38 |
Lim. Edos. SLP/Zac - Lim. Edos. Zac/Jal (Ojuelos) |
70.00 |
82.94 |
12.94 |
14,821,809.05 |
12.94 |
100.00 |
100.00 |
San Luis Potosí - Lim. Edos. SLP/Zac Cuerpos A y B |
14.00 |
20.00 |
12.00 |
11,774,147.80 |
12.00 |
100.00 |
100.00 |
Cd. Valles - Lim. Edos. SLP/Ver (Cpo. A) |
48.00 |
74.00 |
26.00 |
19,203,215.99 |
26.00 |
100.00 |
100.00 |
Cd. Valles - Lim. Edos. SLP/Ver (Cpo. B) |
61.00 |
73.00 |
12.00 |
6,626,827.34 |
12.00 |
100.00 |
98.27 |
Rioverde - Santa Catarina |
135.30 |
139.70 |
8.80 |
6,882,772.61 |
8.80 |
100.00 |
94.80 |
Rioverde - Santa Catarina |
160.00 |
178.00 |
18.00 |
12,506,486.08 |
18.00 |
100.00 |
99.97 |
San Luis Potosí - Lim. Edos. SLP/Zac (Cuerpos A y B) |
25.00 |
36.00 |
22.00 |
22,702,598.83 |
22.00 |
100.00 |
100.00 |
San Luis Potosí - Lim. Edos. SLP/Zac (Cuerpo B) T.A. |
57.00 |
83.00 |
19.00 |
17,123,135.27 |
19.00 |
100.00 |
100.00 |
San Luis Potosí – Lím. De Edos. S.L.P./Zac. |
30.00 |
41.00 |
11.00 |
8,165,828.10 |
11.00 |
100.00 |
98.40 |
San Luis Potosí – Lím. De Edos. S.L.P./Zac. |
52.20 |
64.00 |
11.80 |
8,792,543.02 |
11.80 |
100.00 |
98.40 |
Lím. De Edos. Gto./S.L.P. - Ent. Cerro Gordo |
145.50 |
157.40 |
11.90 |
8,759,039.41 |
11.90 |
100.00 |
98.35 |
San Luis Potosí – Lím. De Edos. S.L.P./Zac. |
89.30 |
98.00 |
8.70 |
7,249,579.93 |
8.70 |
100.00 |
98.40 |
Ramal Tierra Nueva |
0.00 |
13.10 |
13.10 |
9,328,408.67 |
13.10 |
100.00 |
100.00 |
San Luis Potosí, Lím de Edos S.L..P./Zac. (Cuerpo A) |
52-77 |
74-77.5 |
8.50 |
4,878,578.63 |
8.50 |
100.00 |
100.00 |
San Luis Potosí, Lím de Edos S.L..P./Zac. (Cuerpo A) |
63.00 |
70.00 |
7.00 |
3,980,658.12 |
7.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Fresado y Riego de Sello |
|
|
35.94 |
37,368,361.94 |
35.94 |
100.00 |
100.00 |
San Luis Potosí - Lim. Edos. SLP/Zac Cuerpo A |
100.00 |
122.47 |
22.47 |
23,894,730.44 |
22.47 |
100.00 |
100.00 |
San Luis Potosí - Lim. Edos. SLP/Zac Cuerpo B (T.A.) |
100.00 |
122.47 |
13.47 |
13,473,631.50 |
13.47 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Obra de Drenaje |
|
|
3.00 |
1,704,562.24 |
3.00 |
100.00 |
98.29 |
Cd. Valles - T. Tamasopo |
|
|
1.00 |
135,000.00 |
1.00 |
100.00 |
100.00 |
Cd. Valles - Lím. Edos. S.L.P./Tamps. |
|
|
1.00 |
305,000.00 |
1.00 |
100.00 |
100.00 |
Lim. Edos. Hgo/SLP - Cd. Valles |
|
|
1.00 |
1,264,562.24 |
1.00 |
100.00 |
97.70 |
|
|
|
|
|
|
|
|
Conservación Periódica de Puentes |
|
|
7.00 |
3,879,324.10 |
7.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
Santa Catarina - San Luis Potosi |
201+000 |
202+000 |
1.00 |
10,641,390.19 |
1.00 |
100.00 |
100.00 |
Cd. Valles - LÍm. de Edos. S.L.P./Tamps. |
19+000 |
20+000 |
1.00 |
24,269,394.95 |
1.00 |
100.00 |
94.54 |
Huizache - T. Izq. Tula |
34+000 |
35+000 |
1.00 |
5,970,548.98 |
1.00 |
100.00 |
98.93 |
|
|
|
|
|
|
|
|
Conservación Rutinaria de Tramos (Lineal del Estado) |
|
|
1,610.64 |
109,887,269.03 |
1,610.64 |
100.00 |
99.97 |
Gastos de Operación |
|
|
|
4,536,201.00 |
|
|
95.74 |
|
|
|
|
|
|
|
|
Señalamiento Horizontal (Lineal del Estado) |
|
|
1,610.64 |
28,616,755.30 |
1,610.64 |
100.00 |
99.86 |
|
|
|
|
|
|
|
|
Barrera de Protección (contrato no. 049) |
|
|
10,050.00 |
10,279,777.27 |
10,050.00 |
100.00 |
99.67 |
|
|
|
|
|
|
|
|
Señalamiento Vertical (contrato no. 048) |
|
|
4,800.00 |
9,424,290.06 |
4,800.00 |
100.00 |
99.99 |
|
|
|
|
|
|
|
|
Conservación Rutinaria de Puentes (contrato no. 011) |
|
|
118.00 |
5,388,671.88 |
118.00 |
100.00 |
100.00 |
Conservación Rutinaria de Puentes (contrato no. 012) |
|
|
100.00 |
4,128,389.94 |
100.00 |
100.00 |
99.94 |
Conservación Rutinaria de Puentes (contrato no. 013) |
|
|
119.00 |
5,479,983.58 |
119.00 |
100.00 |
99.71 |
|
|
|
|
|
|
|
|
Estudios y/o Proyectos |
|
|
|
4,900,000.00 |
|
|
89.67 |
Seguimiento |
|
|
|
3,285,250.82 |
|
|
100.00 |
|
|
|
|
|
|
|
|
(APP San Luis Potosí - Matehuala) |
|
|
379.91 |
152,605,777.85 |
|
|
80.71 |
|
|
|
|
|
|
|
|